| MOQ: | 100 |
| Price: | Negotiable |
| Delivery Period: | 5-8 work days |
| Material: | ABS | Polishing: | Upc/APC |
|---|---|---|---|
| Ferrule: | Ceramic | Cable: | 3.0 X 2.0mm Cable |
| Average Assembling Time: | ≤ 3 Min | Size: | 55*9*7mm(mm) |
| Cable Dia: | 0.9, 2.0,3.0mm | Polish: | APC |
| MOQ: | 100 |
| Price: | Negotiable |
| Delivery Period: | 5-8 work days |
| Material: | ABS | Polishing: | Upc/APC |
|---|---|---|---|
| Ferrule: | Ceramic | Cable: | 3.0 X 2.0mm Cable |
| Average Assembling Time: | ≤ 3 Min | Size: | 55*9*7mm(mm) |
| Cable Dia: | 0.9, 2.0,3.0mm | Polish: | APC |